Project

Specification of source materials needed for elaboration of informative offer of the SSP II project:

  1. Medium transported.
  2. Inside diameter of piping.
  3. Operating pressures.
  4. Control room location.
  5. Valve shafts – distribution overview.
  6. Longitudinal profile of the route.
  7. Overall length of the route.
  8. System of data transmission.
  9. Existence of electric kiosks or switchboard off the explosion-hazard areas
  10. Accessibility of 220V power supply sources.

Specification of source materials needed for elaboration of a binding offer of the SSP II project:

  1. The above data necessary for elaboration of the informative offer.
  2. Technological schematic of the route.
  3. Digitized map of the route.
  4. Personal inspection of shafts and electric kiosks.

Conditions of the SSP II system application:

  1. Locations of line stations en route.
  2. Electric power sources for the line stations.
  3. Data transmission among the line stations and control room (cables, satellite or radio transmission).
  4. Minimum operating pressure of the medium of 0.5MPa.
  5. Ability of the customer to establish the pressure transmitters tap points in the valve shafts.
  6. Enable a cable connection of the pressure transmitters with the line stations.

Secar Bohemia, a.s., ensures the following in a form of sale or leasing in cooperation with the client:

  1. Design documentation.
  2. Delivery and assembly of hardware.
  3. Implementation and configuration of software.
  4. SSP II testing, putting into operation and hand-over of the to user.
  5. Training of the user and user‘s manuals.
  6. Continuous passive monitoring of operation.
  7. Guarantee and after-guarantee service.